Case Studies

QGPC
In 1997 against an international tender HiSys was awarded the contract to scan, index and load to the host system 4 Million+ paper based drawings/ documents. Time taken 11 months 14 days, 45 days ahead of schedule. Over 14000 documents were processed a day during the project.

ZADCO
In 1999 against an international tender HiSys was awarded the contract to scan, index and load to the host system over 200,000 engineering drawings and associated documents ranging in size from A4 to A0. Time taken 13 months. much ahead of schedule